Rockford successfully completed these projects in 2008.
Gulf Crossing Expansion Project: Rockford completed the Gulf Crossing Expansion Project in October 2008 for Gulf Crossing Pipeline Company, LLC.
Fifty four (54 miles) of 42" diameter pipeline to be laid in the big thicket of East Texas over into Louisiana. Three directional drills, wetland construction.
To view photos of this project, click on the numbered links above the photo at right.
Lodi Gas Storage System Phase 2 Project: Phase 2 installation of 4,800 feet of 12" pipe to three well site pads, hook up of 8 well heads, and installation of 2 compressors with horse power combined of 6300 HP.
In addition, all of the associated piping, skid mount units, the compressor building, stiles, platform and supports were installed. The expansion added an additional 12 Bcf of working gas storage capacity and provides an additional 100,000 MMBtu/day of firm injection and 200,000 MMBtu/day of firm withdraw. The project was completed in May 2009.
To view photos of this project, click on the numbered links above the photo at right.
TransCanada, Ehrenberg Compressor Station Project: Located in Ehrenberg, Arizona, this project's requirements were to change out two Rolls Royce compressors and install 2 Solar Taurus 60 7700 HP and the associated piping and skid units. This project was completed in June 2008.
To view photos of this project, click on the numbered links above the photo at right.
Blythe Compressor Station Project: Blythe compressor station interconnects piping 30" to achieve capacity of 1.2 Bcf movements per day.
To view photos of this project, click on the numbered links above the photo at right.
Phoenix Expansion Project: 150 miles of 36" pipeline from north of Phoenix to near Casa Grande, Arizona. Mostly desert construction with some highly congested areas. Requires several directional drills and special dry wash construction. Completed: December 2008.
To view photos of this project, click on the numbered links above the photo at right.