2006 Projects

Rockford successfully completed these projects during 2006.


Kinder Morgan

East Line Expansion Project: Construction of 235 miles of new 16" and 12" pipeline in Texas, New Mexico, and Arizona. Includes survey, x-ray, GPS As-Built drawings, and hydro test of the existing 12" and 8" parallel system. Completed: June 2006

To view photos of this project, click on the numbered links above the photo at right.

East Line Project East Line Project East Line Project

Lodi Gas Storage

Gas Storage System Project: The Lodi Gas Storage Project was located near Rio Vista, California, and included the construction of a grass roots compressor/injection plant. Lodi Gas also had Rockford install six miles of 12" and 16" diameter pipe. Completed: November 2006.

To view photos of this project, click on the numbered links above the photo at right.

Lodi Gas Storage Project Lodi Gas Storage Project Lodi Gas Storage Project Lodi Gas Storage Project Lodi Gas Storage Project Lodi Gas Storage Project Lodi Gas Storage Project

Williams Northwest Pipeline

Northwest Pipeline, Capacity Replacement Project: Ft. Lewis Spread — 22.5 miles of 36" looping of existing system near Tacoma, Washington. Requires the open cut of the Nisqually River, approximately 12,000 LF of concrete coated pipe in wetlands, and several valve installations that required stopple fittings.

Snohomish spread — 11.8 miles of 36" replacing an existing 26" near Redmond, Washington. Consisted of congested work as well as a 1500 LF push site and installation of several 30" block valves. Completed: October 2006

To view photos of this project, click on the numbered links above the photo at right.

Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project Williams Northwest Project