Rockford completed the projects listed below over the span of 2002-2005.
Concord Tank Farm and Terminal Modification Project: This project required construction of new retaining walls, while keeping the facility operational. Hand-excavation was required under extremely hazardous conditions. This project was an upgrade to Kinder Morgan's terminal facility in Concord, California. The terminal provides fuel (jet fuel, gasoline, and diesel) to Sacramento, California; Reno, Nevada; Travis Air Force Base; Sacramento Airport; and the air bases in Fallon, Nevada.
The terminal needed to be upgraded to meet the requirements of a new larger capacity pipeline being installed from the terminal to Sacramento, California. Services included: installing launcher and receiver for a 20-inch diameter pipeline, new lines for the storage tanks, new surge header, tank, removing existing containment dike, installing a new concrete/cinder block dike, new pumps and prover, and finally new lines and tie-in. This was done without interrupting the functionality of the terminal. The facility was completed in December 2004.
To view photos of this project, click on the numbered links above the photo at right.
South Mist Pipeline Expansion Project: Forty Six (46) mile expansion of the 24" South Mist Pipeline from Aurora, Oregon, to Bacona, Oregon. All types of pipeline construction, cross country hills, three miles of "in-street" construction, also included fourteen (14) directional drills. Reimbursable fixed fee contract format; with an incentive clause. Third large project performed under this format for NW Natural. Saved owner approximately $5 million over the hard money competitive bid price. Completed: October 2004
To view photos of this project, click on the numbered links above the photo at right.
Consumnes Pipeline Extension Project: Rockford installed twenty five miles of 24" diameter pipe from the Carson Ice Plant to the Consumnes Power Plant near Elk Grove, California. The project also included five major directional drills and a fiber optic system. Completed: October 2004.
To view photos of this project, click on the numbered links above the photo at right.
Wild Goose Project: Installation of 25 miles of 30" 0.438 wt, x-70 pipeline, from the PG&E Delevan Compressor Station to the Wild Goose compressor facility near Gridley, California. Five directional drills and 26 bored canal crossings. Reimbursable fixed fee contract format. Completed: September 2003
To view photos of this project, click on the numbered links above the photo at right.
Redwood Path 42Ó Expansion Project: Filled in two skips in the PG&E 42" Pipeline in northern California totaling 14 miles. Project included both rock trencher and blast rock ditch in severe hills. Crossed two very environmentally sensitive streams at the bottom of steep slopes. Job bid under internet auction. Completed: August 2002