2009 Projects
Jump to photo galleries of the following 2009 projects to learn more about them and see photos:
- Kinder Morgan/ConocoPhillips – Rockies ExpressPipeline (REX) Project: 31.5 mile spread of 42" pipe near Zanesville, Ohio
- Niska Gas Storage – Wild Goose Storage Compressor Station Expansion Project: Installed 4 miles of 24" pipeline, well pad piping, compressors
2008 Projects
Jump to photo galleries of the following 2008 projects to learn more about them and see photos:
- Gulf South Pipeline Company, LLC – Gulf Crossing Expansion Project: 54 miles of 42" diameter pipeline
- Lodi Gas Storage LLC – Phase Two Installation Project: 4,100 feet of 12" pipe
- Solar Turbines/TransCanada – Ehrenberg Compressor Station Project: Changed out and installed two new compressors
- Southern California Gas Company – Blythe Compressor Station Project: Interconnect piping 30" to increase capacity
- Transwestern Pipeline Company – Phoenix Expansion Project: 144 miles of 36" pipeline in desert, urban areas
2007 Projects
Jump to photo galleries of the following 2007 projects to learn more about them and see photos:
- Energy Transfer – Katy Pipeline Project: Work on 54 mile long 42" mainline
- Kinder Morgan – El Paso to Phoenix Expansion: Construction of 138 miles of 16" in Texas, New Mexico, and Arizona
2006 Projects
Jump to photo galleries of the following 2006 projects to learn more about them and see photos:
- Kinder Morgan – East Line Expansion Project: Construction of 235 miles of new 16" and 12" pipeline
- Lodi Gas Storage – Gas Storage System Project: Construction of a grass roots compressor/injection plant
- Williams Northwest Pipeline – Northwest Pipeline, Capacity Replacement Project: Two projects consisting of 22.5 miles and 11.8 miles each of of 36" pipe
2002-2005 Projects
Jump to photo galleries of projects we completed over the course of 2002-2005 to learn more about them and see photos:
- Kinder Morgan – Concord Tank Farm and Terminal Modification Project: This project required construction of new retaining walls, while keeping the facility operational
- NW Natural Gas – South Mist Pipeline Expansion Project: 46-mile expansion of the 24" South Mist Pipeline from Aurora, Oregon, to Bacona, Oregon
- Sacramento Municipal Utility District – Consumnes Pipeline Extension Project: 25 miles of 24" diameter pipe and 5 major directional drills
- Wild Goose Storage, Inc. – Wild Goose Project: Installation of 25 miles of 30" 0.438 wt, x-70 pipeline
- Pacific Gas & Electric – Redwood Path 42" Expansion Project: Filled in two skips in the PG&E 42" Pipeline in northern California totaling 14 miles