Compressor Station & Storage Work

Below are examples of compressor station and storage projects work we have performed for clients.

Check out some of the past compressor station we have completed over the years. Jump to our Past Projects page.

Would you like to contact a reference from any of our projects? Click here for more information.


Lodi Gas Storage, LLC

Lodi Gas Storage System: Phase 2 installation of 4,800 feet of 12" pipe to three well site pads, hook up of 8 well heads, and installation of 2 compressors with horse power combined of 6300 HP.

In addition, all of the associated piping, skid mount units, the compressor building, stiles, platform and supports were installed. The expansion added an additional 12 Bcf of working gas storage capacity and provides an additional 100,000 MMBtu/day of firm injection and 200,000 MMBtu/day of firm withdraw. The project was completed in May 2009.

To view photos of this project, click on the numbered links above the photo at right.

Kirby Hills Project Kirby Hills Project Kirby Hills Project Kirby Hills Project

Solar Turbines

TransCanada, Ehrenberg Compressor Station Project: Located in Ehrenberg, Arizona, this project's requirements were to change out two Rolls Royce compressors and install 2 Solar Taurus 60 7700 HP and the associated piping and skid units. This project was completed in June 2008.

To view photos of this project, click on the numbered links above the photo at right.

Solar Turbines Project Solar Turbines Project Solar Turbines Project

Kinder Morgan

Concord Tank Farm and Terminal Modification Project: This project required construction of new retaining walls, while keeping the facility operational. Hand-excavation was required under extremely hazardous conditions. This project was an upgrade to Kinder Morgan's terminal facility in Concord, California. The terminal provides fuel (jet fuel, gasoline, and diesel) to Sacramento, California; Reno, Nevada; Travis Air Force Base; Sacramento Airport; and the air bases in Fallon, Nevada.

The terminal needed to be upgraded to meet the requirements of a new larger capacity pipeline being installed from the terminal to Sacramento, California. Services included: installing launcher and receiver for a 20-inch diameter pipeline, new lines for the storage tanks, new surge header, tank, removing existing containment dike, installing a new concrete/cinder block dike, new pumps and prover, and finally new lines and tie-in. This was done without interrupting the functionality of the terminal. The facility was completed in December 2004.

To view photos of this project, click on the numbered links above the photo at right.

Concord Station Project Concord Station Project Concord Station Project

Southern California Gas Co.

Blythe Compressor Station Project: Blythe compressor station interconnects piping 30" to achieve capacity of 1.2 Bcf movements per day.

To view photos of this project, click on the numbered links above the photo at right.

Blythe Station Project Blythe Station Project